Service/Maintenance

fan_service maint.jpgThe BahnsonAire fan is designed and engineered to maximize operational longevity and minimize repair. When maintenance needs do arise, we have the inventory of parts and technical expertise needed to provide rapid response.

Engineered for Durability, Easy to Maintain

The BahnsonAire fan has an impressive lifespan and is capable of running all day with little need to stop for repair or adjustment. Furthermore, the fan’s castings, motor, blades, and shroud mount are all constructed with lightweight materials that significantly streamline the maintenance process.

When maintenance happens less frequently and is completed more efficiently, our clients avoid costly, time-consuming shutdowns to production.

Reliable Support When You Need It

We have a team of professional service technicians that have extensive knowledge of our fan’s design, which helps them resolve complex problems with ease. They are ready to rapidly respond, 24/7/365 to keep equipment operating its finest.

For clients with in-house maintenance teams or existing service agreements, we also have an extensive inventory of parts and an online parts store that provides easy access to the components they need.

Contact us today to learn more about the BahnsonAire fan’s low-maintenance design.

Tenant Build-Out Project Spotlight

Tenant Build-Out Project Highlight

When a large law firm needed to expand and modernize its offices, they called on Gibson Electric for a complete package of electrical contracting services.

During the project, we installed a complete structured-cable system, the highlight of which was a data center build-out and riser providing high-speed interconnectivity to the rest of the office suites.

The facility’s two floors worth of data center space features:

  • Separate and dedicated electrical service and distribution systems
  • Emergency generator
  • Uninterrupted power supply (UPS)
  • N+1 power support

Throughout the entirety of the project, Gibson Electric maintained our client’s strict move-in schedule. The remaining 25-floor build-out included:

  • Two complete high-end conference centers
  • State-of-the-art conferencing ambiance controls
  • Comprehensive electrical installation
    • Voice/data structured systems
    • Life safety systems
    • Lighting fixtures
    • Electrical receptacles